NPOESS Weather Satellites

NPOESS · DoD · Northrop Grumman · cancelled

+115% $6.5B (2000) → $13.9B (2009)
NPOESS Weather Satellites: cost trajectory from $6.5B in 2000 to $13.9B in 2009, +115% growth. Explore NPOESS interactively → Download 1-page brief (PDF)
Baseline
$6.5B (2000)
Current estimate
$13.9B (2009)
Cost growth
+115%
Units
6 → 4
Quantity change
−33%
Unit-cost change
+222%
IOC
2000s (planned) → Dissolved 2010
Schedule slip
Cost basis
TY
Confidence
medium · reconciled
A tri-agency (DoD/NOAA/NASA) program that roughly doubled ($6.5B → $13.95B life-cycle) and breached Nunn-McCurdy before being DISSOLVED in 2010 — split into JPSS + DWSS, which inherited the mission (not a clean kill). Satellites cut 6 → 4.

Documented events

Source: GAO-09-772T (confirmed): "costs have grown to $13.95B" — life-cycle, 4 satellites through 2026; GAO-10-558 later ~$15B. Nunn-McCurdy breach 2005–06.

Drift — an independent project by Aous Abdo, built from public GAO, CRS and DoD sources. Cost growth has many causes; a larger number is not by itself evidence of mismanagement. How this is built · Explore the data →